Monday, December 14, 2009

Oct 10th meeting with Clarendon re see Tender and Plans

October 10th 2009
On Oct 10th we met with Clarendon to go over the proper plans and Tender.
This consumed about 3 hours but we pointed out mistakes on the plan which were crucical to deal with.
1. Because of the garage being lengthened to fit 2 cars and be able to get in and out of the cars, the architect had redrawn the garage roof line from that of original drawings of Kingston fascade to a gable that went from left up to a pinacle and then horizontaly across, as shown in above plan. This of course changed the windows on the front of the rumpus room from 1209 to 0609 which changed the fascade without any real building reason for doing so.
2. The second grave error that the architect did was to put two non-matching sized windows in rear main bedroom suite due to addition of alfresco. Why would a person put in unmatched windows? It beggars belief.
So we pointed out these in detail and discussed and she made notes to send to architect. She said she would discuss with the other salesman on the next day, Sunday.

No comments:

Post a Comment